Completion of new horizontal wells with multiple stage water-fracs. Responsibilities include writing completion procedures, developing creative ways to improve completion operations, optimizing stimulation costs and horizontal fracs with respect to stage work and stimulation design, supervision of field consultants, performing field studies and evaluations of completion techniques, frac design and implementation, and some reservoir engineering.